Photovoltaic noise barriers
An efficient way of noise prevention by application of photovoltaic modules was first demonstrated in Switzerland in 1989. Later, the solution was applied also in some other European countries. Different photovoltaic noise barriers can be built considering motorway features, barrier construction, the height of the barrier, and other factor influence (environment etc.). Modules are fixed on the main barrier (a wood or a solid barrier) in different ways, such as vertical, tilted fixed as a zigzag construction etc.
Photovoltaic noise barriers worldwide
Power |
Location [1] | Description [2] | On Grid | Image |
3 MW |
Germany, Mühlsdorf, Thuringia |
A4 Motorway | 2012 | |
2.65 MW |
Germany, Goldbach/Hösbach, Bavaria |
A3 Motorway Image: Ralos |
2009 | |
1 MW |
Germany, Wallersdorf, Bavaria |
A92 Motorway | 2017 | |
1 MW |
Germany, Bollberg, Thuringia |
A4 Motorway | 2015 | |
1 MW |
Germany, Töging am Inn, Bavaria |
A94 Motorway | 2007 | |
833 kW |
Italy, Oppeano |
S.S. 434 Transpolesana Image: FAR Systems |
2010 | |
730 kW |
Italy, Marano d'Isera |
A22 Motorway Image: FAR Systems |
2009 | |
718 kW |
Germany, Freising, Bavaria |
A92 Motorway Image credit: Gehrlicher Solar |
2003–2009 | |
365 kW |
Germany, Freiburg |
Noise barrier B31 | 2006 | |
283 kW |
Germany, Bürstadt, Hesse |
Noise barrier B57 Image credit: SolarArt |
2010 | |
262 kW |
Switzerland, Domat/Ems |
A13 Motorway Image: pvresources |
1989, repowered in 2019 | |
216 kW |
The Netherlands, Amstelveen |
A9 Motorway Image: pvresources |
1998 | |
180 kW |
Germany Vaterstetten, Bavaria |
Noise barrier along railway tracks | 2004 | |
123 kW |
Switzerland, Melide, Tessin |
Gothard Motorway | 2007 | |
104 kW |
Switzerland, Giebenach |
A2 Motorway | 1995 | |
103 kW |
Switzerland, Gordola |
Noise barrier along railway |
1992 | |
101 kW |
Austria, Gleisdorf, Styria |
A2 Motorway | 2001 | |
100 kW |
Germany, Sausenheim |
A6 Motorway | 1999 | |
95 kW |
Germany, Reundorf, Bavaria |
Noise barrier along railway | 2020 | |
90 kW |
Germany, Biessenhofen |
Noise barriere Nestle facility | 2010 | |
89 kW |
Switzerland, Zumikon |
Forchstrasse, Zumikon | 2014 | |
80 kW |
Switzerland, Safenwil |
A1 Motorway | 2001 | |
75 kW |
Germany, Schwäbisch Hall, Baden Würtemberg |
Reinhold-Würth-Airport noise barrier | 2008 | |
63 kW |
France, Foquiere |
A21 Motorway | 1999 | |
60 kW |
Germany, Saarbrücken |
A620 Motorway 40 kW + 20 kW |
1995 | |
55 kW |
The Netherlands, Utrecht |
A27 Motorway | 1995 | |
53 kW |
Germany, Emden |
A31 Motorway Image: EWE AG |
2003 | |
52 kW |
Germany, Neuötting, Bavaria |
Noise barrier B12 |
2016 | |
40 kW |
Austria, Seewalchen |
A1 Motorway | 1992 | |
30 kW |
The Netherlands, Pijnacker-Nootdorp, South Holland |
Noise barrier N470 | 2017 | |
30 kW |
Germany, Walchstadt am Ammersee, Bavaria |
A96 Motorway | 1997 | |
30 kW |
Germany, Rellingen, Schleswig-Holstein |
A23 Motorway | 1992 | |
28 kW |
Germany, Großbettlingen, Baden Würtemberg |
"Stoiadler III" noise barrier | 2006 | |
24 kW |
Australia, Melbourne |
Tullamarine-Calder Interchange, Essendon Airport Image credit: Climate Managers |
2007 | |
12 kW |
Switzerland, Münsingen |
Noise barrier along railway | 2008 | |
10 kW |
Switzerland, Zürich, Bruttisellen |
A1 Motorway | 1999 | |
10 kW |
Switzerland, Zürich, Aubrugg |
A1 Motorway | 1997 | |
9.6 kW |
Switzerland, Zürich, Walliselen |
Noise barrier along railway | 1998 | |
7.544 kW |
Germany, München, Pasing |
Transparent noise barrier Image credit: ertex solar |
2013 |
Notes
[1] | Power is specified in MWp if DC array power is known. If DC array power is unknown than output power is specified. In some cases it is unclear if the power plant power is output or DC array power. |
[2] | Not all of mentioned PV noise barriers are still in operation. List is not complete. All entries are given "as is" without warranties of any kind. |
Photovoltaic noise barrier along A13 in Switzerland
In 1989 the world's first photovoltaic noise barrier alongside the B13 motorway near Chur, Switzerland was commissioned. In 2019 the system was repowered and enlarged and it delivers now more than 300 MWh of electricity annually to the public grid.
Commissioned | 1989, repowered in 2019 |
Rated power | 100 kW, 262 kW repowered |
Annual yield | 100 MWh, repowered 330 MWh |
Number of modules | 2208 Kyocera, 782 LG modules |
Total PV area | 968 m2, 1339 m2 repowered |
Module mounting | Tilt angle 45°, 25° toward E |
Utility interconnection | Siemens central inverter, ABB repowered |
Photovoltaic noise barrier at the A9-motorway, the Netherlands
large photovoltaic (PV) energy system has been integrated into a noise barrier at the A9-motorway near Ouderkerk aan de Amstel (Amsterdam), the Netherlands. The PV-system consists of 2160 modules with module inverters.
Commissioned | 1996 |
Rated power | 220 kW |
Annual yield | 176 MWh |
Number of modules | 2160 Shell Solar cSi modules |
Total PV area | 2200 m2 |
Module mounting | Tilt angle 50° |
Utility interconnection | 2160 module inverters |
Books and brochures
Eiffert, Patrina and Gregory J. Kiss. 2000. Building-Integrated Photovoltaic; Designs for Commercial and Institutional Structures - A Sourcebook for Architects, NREL/BK-520-25272.
Prasad, Deo and Mark Snow (eds.). 2005. Designing with Solar Power: A Source Book for Building Integrated Photovoltaics (BIPV). London, Sterling, VA: Earthscan. ISBN 1-844071-47-2.
Reports
Clavadetscher, Luzi and Thomas Nordmann. 1999. 100 kWp Grid-Connected PV-Installation along the A13 Motorway in Switzerland - Plant Monitoring and Evaluation - Operation and Maintenance, Annual Reports for the Swiss Federal Office of Energy, 1990 to 1999. Project No. 32046.
De Jong, Mine. 2015. Solar Highways Benchmark Study. An overview and evaluation of existing photovoltaic noise barriers. SEAC, January 2015.
Nordmann, Thomas, A. Frölich and Luzi Clavadetscher. 2002. Drei integrierte PV-Schallschutz Versuchsfelder, Bau und Erprobung. Schlussbericht PV P+D, DIS 17225 / 59391, Dezember 2002. Erlenbach: TNC Consulting AG.
Solar Highways, Final Report LIFE13ENV/NL/000971,
TNC. 1999. EU PVNB POT: Evaluation of the Potential of PV Noise Barrier Technology for Electricity Production and Market Share. Thermie B Project. Project Number: SME 1479-97, Final Report Volumes 1&2, TNC GmbH, Freiburg, 29 June 1999.
Van der Borg, N. J. C. M. and M. J. Jansen. 2001. Photovoltaic noise barrier at the A9-highway in the Netherlands. Results of the monitoring programme. Report, ECN-C--01-021, Nuon International, EU Commission, February 2001. Also included in the pvdatabase.
Papers
PV database | |
Solar Highways | |
PV Highway Noise Barriers Project, by. P. Kleeman | |
TNC, PV Schallschutz Anlagen |